2012/2013
This refurbishment is currently ongoing and involves partial refurbishment of 3 bathroom areas and fire upgrade works in a live hospital. All systems were maintained operational during the construction period. The full refurbishment and extension of an additional ward is planned to proceed in 2013 with the same design team.