4 Classroom extension (€500k)
Read MoreScoil Nioclais, Dunlavin
2011 Summer Works Scheme 2011 Upgrading of Heating System and 2013 Special Needs Unit Extension (500k)
Read MoreSummer Works 2011, 2014, 2015
2011, 2014, 2015 Numerous Primary and Post Primary School Projects including Heating and Electrical upgrades in various schools, some examples: St Conleth’s College, Newbridge; Blessington Community College; Holy Family Junior National School, Swords, Templeogue College; Killina Presentation Secondary School, Rahan, Tullamore; Jonathan Swift NS, Dunlavin; Stratford Lodge National School, Baltinglass; Mercy Secondary School, Kilbeggan and […]
Read MoreEnergy Efficiency Retrofit Project
2010 Lead Project Engineer in an SEAI funded programme including retrofitting insulation, high efficiency light fittings, controls for heating systems and hot water generators in 2010. Gerd was selected as one of the speakers at the Energy in Education Conference in Tullamore in November 2010.
Read MoreBetter Energy in workplaces grant (SEAI)
2011 A consortium of 26 schools across 11 VEC’s. This project included retrofitting energy saving measures such as high efficiency boilers, T5 light fittings, daylight controllers, absence detection, heating controls, wall and roof insulation etc.
Read MoreRefurbishment and Extension of Rathangan Community Centre
2013 This complete refurbishment is planned to start and be completed in 2013. The total refurbishment includes a new radiator based heating system, heat recovery, water services, fire alarm, emergency lighting, electrical services etc.
Read MoreRefurbishment of St. Vincent’s Hospital, Athy
2012/2013 This refurbishment is currently ongoing and involves partial refurbishment of 3 bathroom areas and fire upgrade works in a live hospital. All systems were maintained operational during the construction period. The full refurbishment and extension of an additional ward is planned to proceed in 2013 with the same design team.
Read MoreRefurbishment of Baltinglass Hospital
2012/2013 This refurbishment is currently ongoing and involves partial refurbishment of a live hospital. Particular consideration was given to keeping the heating, emergency lighting and fire alarm system fully functional during construction. The hospital will have 64 bedrooms when complete.
Read MoreNewport Courthouse
2014 This project was a design & build contract with Solaregy and comprised the installation of a sustainable heating system to an existing courthouse. The chosen system consisted of an air source heatpump and low temperature radiators. The clients are very happy with the system.
Read MoreBallina Swimming Pool Renewable Heating Solution
2012 This project was a design & build contract with Solaregy and comprised the installation of a sustainable heating system to heat the swimming pool water. The chosen system consisted of 2 air source heatpumps and stainless steel heat exchangers. The clients, Tipperary County Council, are very happy with the system.
Read More